Project category

Environmental Works, Rain Pipe, Outdoor Design and Swimming Pool Construction

Area

Nafpaktos

Condition

Ended in Year 2017

General characteristics

  • Preprocessing infrastructure environments
  • Rain Pipe Installation
  • Swimming pool construction

Configuration of the outdoor space