Project category
Environmental Works, Rain Pipe, Outdoor Design and Swimming Pool Construction
Area
Nafpaktos
Condition
Ended in Year 2017
General characteristics
- Preprocessing infrastructure environments
- Rain Pipe Installation
- Swimming pool construction
Configuration of the outdoor space